The New Studio Saga

March 5, 1999 (Part 2)


 

I sealed the floors, and have been trying to get all the wiring done that will be sealed in the walls.

 

My trusty cat Man Ray

is helping me out enclosing the bench room. I am dropping the ceiling to about 10 feet there to facilitate air conditioning and to provide some storage space above.

I am ready for my structural inspection, and in about a week hope to be ready for the rough-in electrical inspection.

Then I can have foam insulation sprayed in, have the heating and cooling system put in, and then drywall. If anyone knows a reliable drywall contractor in the Kingston Springs area, give me a call! There is only one in the phone book. I have called twice and left messages-they don't return calls. While I am waiting, I will probably end up doing it myself!

 

Back Next

 

Back to Start (for Non-Frames Browsers)


Craig Nutt - Fine Wood Works
www.craignutt.com
Copyright:  Craig Nutt, Kingston Springs, TN  USA
All Rights Reserved