The New Studio Saga

April 20, 1999


I have been busting my butt the last week to get my sheet rock taped and finished behind the area where my duct work will go and to get the ceiling up in the gallery.

I decided to go for the cool look of exposed trusses and galvanized tin in the gallery. The ceiling is corrugated tin, and Mid-State Air Conditioning and Heating from Fairview agreed to do an extra neat installation of exposed ductwork.

These are the furnace installers in front of their handiwork. The furnace is gas and is located above the bench room. Dampers will allow for adjusting the heat and cooling between the gallery and bench room. The machine room will be heated by a separate heater, and is ventilated with a 4 foot fan in the gable.

Ready or not I start moving in a little over a week. I hope to get the machine room stained and the paneling up in the bench room before then!

Back Next

 

Back to Start (for Non-Frames Browsers)


Craig Nutt - Fine Wood Works
www.craignutt.com
Copyright:  Craig Nutt, Kingston Springs, TN  USA
All Rights Reserved